100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Whips

Popular National Hunt racing whip from Pro Cush. Foam covered end with a plain coloured shaft and long rubber handle. Strong yet light in the hand and non-marking for the horse. This is the BHA approved whip for racing. ..
From £42.00 (inc. VAT) £35.00 (ex. VAT)
The Pro Cush Junior Whip is a short whip specially designed for younger riders or riders who prefer a bat style whip, being lighter and easier to carry than the full size versions. Features: 22 inches with an 8 inch padded shock-absorbing en..
From £34.74 (inc. VAT) £28.95 (ex. VAT)
Popular flat race whip from Pro Cush. Foam covered end with a plain coloured shaft and long rubber handle. Strong yet light in the hand. This is the BHA approved whip for racing. ..
From £48.00 (inc. VAT) £40.00 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo