100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Turnout Rugs

Turned out horses will love the 300g warm fill of this heavyweight Highlander Original turnout rug & neck set. A detachable neck cover ensures versatile winter protection. Features: 300g polyfill with 600 denier ripstop outer Detachable ne..
From £107.99 (inc. VAT) £89.99 (ex. VAT)
Wrap you horse up this winter with Horseware®’s top of the range Rambo Wug 400g heavy weight turnout rug. Features: Strong 1000D Ballistic nylon outer, waterproof and breathable 400g bonded fibrefill for warmth Anti bacterial lining Le..
From Now £180.00 (inc. VAT) Was £295.00 (inc. VAT) £150.00 (ex. VAT)
The Tempest Original 300g turnout rug and neck set offers excellent winter warmth during cold weather. The set offers great layering options in changing weathers with a neck cover that attaches to the rug and fastens with touch close straps. Featu..
From £87.99 (inc. VAT) £73.33 (ex. VAT)
Horseware®’s Amigo® Bravo turnout rug is available here as a cosy 400g heavy weight winter rug, providing warmth and performance whilst maintaining comfort and freedom of movement for your horse. This robust rug loves soggy and cold weather, even ..
From £194.95 (inc. VAT) £162.46 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo