100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Therapy Boots

Ice-Vibe® Hock Wrap for cooling horses' hock area. Ice packs are used in conjucntion with the vibrating panels in the boots to reduce soreness and swelling, boost circulation and stimulate headling. Contoured to fit the hock while maintaining full mo..
From £197.50 (inc. VAT) £164.58 (ex. VAT)
Ice-Vibe® Boots for cooling horses' legs. Ice packs are used in conjucntion with the vibrating panels in the boots to reduce soreness and swelling, boost circulation and stimulate headling. Features: Smooth neoprene outer to repel shavings ..
From £211.95 (inc. VAT) £176.63 (ex. VAT)
Professional Choice’s Six Pocket Ice Boots are convenient for icing from just below the knee or hock down to the pastern. It uses five hook fastening straps to secure around the leg and six inside elastic pockets for ice. The elastic pockets graduall..
From £120.00 (inc. VAT) £100.00 (ex. VAT)
Taller than the six pocket ice boots, these boots can be used to ice from above the knee or hock all the way to the pastern. Secured using 6 hook fastening straps for a custom fit, with nine individual inside pockets for ice. The elastic pockets grad..
From £130.00 (inc. VAT) £108.33 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo