100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Tape

Wider and stronger than the standard coloured Ticki Tape this silver duct tape has a number of uses in the yard. Each roll: 70mm x 50m ..
From £7.25 (inc. VAT) £6.04 (ex. VAT)
Coloured electrical tape by Ticki Tape used to secure boots and bandages on horses along with a miriad of other uses around the yard. Each roll: 19mm x 20m ..
From £1.35 (inc. VAT) £1.13 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo