100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Electrolytes

ISOPRO is a complementary (dietetic) feed for horses for the compensation of electrolyte loss in cases of heavy sweating. It is a concentrated, scientifically formulated and cost effective electrolyte supplement for daily use in performance horses. ..
From £24.95 (inc. VAT) £24.95 (ex. VAT)
Superlyte is a complementary (dietetic) feed for horses for the compensation of electrolyte loss in cases of heavy sweating. Features: Scientifically formulated electrolyte syrup for top performance Fast acting, balanced formula to replace..
From £58.75 (inc. VAT) £58.75 (ex. VAT)
Like the Superlyte Syrup, these Superlyte Paste Syringes are a complementary (dietetic) feed for horses for the compensation of electrolyte loss in cases of heavy sweating. The syringes are ideal for use immediately after exercise or competitions and..
From £22.50 (inc. VAT) £22.50 (ex. VAT)
When horses work hard they regulate their body temperature by sweating, as when hot. This not only loses fluid as it evaporates but also essential body salts, particularly sodium, potassium, calcium and magnesium. Failure to replace these body salts ..
From £19.95 (inc. VAT) £19.95 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo