100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Stirrup Leathers

Super soft English leather is wrapped around a web lining to create a supple yet strong stirrup leather of the highest quality. Features: Non-stretch web lined for strength Top quality English leather Stainless steel roller buckle Slim..
From £61.99 (inc. VAT) £51.66 (ex. VAT)
The EJ Wicks 5* stirrup leathers are made from the highest quality English hide, finished with stainless steel buckles. One size only 48”. ..
From £57.90 (inc. VAT) £48.25 (ex. VAT)
The EJ Wicks 4* stirrup leathers are made from the high quality European hide, finished with stainless steel buckles. One size 48” ..
From £38.50 (inc. VAT) £32.08 (ex. VAT)
These Stirrup leathers are made from Quality English Bridle Leather with stainless steel buckles and two rows of stitching at the buckle end. As they are made from bridle leather (Not Stirrup Butt) they are designed for beginners & young lighter w..
From £32.95 (inc. VAT) £27.46 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo