100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Haynets

Extra strong nylon haynet with larger holes and metal rings. Mesh size: 10cm (4”) Size: 42” (107cm) long Capacity: 6.5kg ..
From £5.95 (inc. VAT) £4.96 (ex. VAT)
These nets are suitable for hay or haylage. Fine mesh holes ensure hay lasts longer and there is less waste on the stable floor. Mesh size: 5cm (2”) Size: Small – 30” (76cm) long Capacity: 4kg   ..
From £5.50 (inc. VAT) £4.58 (ex. VAT)
These nets are suitable for hay or haylage. Fine mesh holes ensure hay lasts longer and there is less waste on the stable floor. Mesh size: 5cm (2”) Size: Large – 40” (102cm) long Capacity: 6.5kg   ..
From £7.95 (inc. VAT) £6.63 (ex. VAT)
Extra strong haylage net with large ring at base, strong hanging rope and small holes to make forage last longer. Suitable for haylage or for controlled feeding of hay. Mesh size: 4.5cm (1.75”) Size: Small – 36” (92cm) long Capacity: 6.5kg ..
From £9.95 (inc. VAT) £8.29 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo