100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Feeding

Robust feed scoop with a plastic coated metal handle for durability. Frost proof. ..
From £5.50 (inc. VAT) £4.58 (ex. VAT)
The Small Shallow Gorilla Tub® 15L (previously known as Tubtrugs) is a flexible and weather resistant tub that is built to last. You can use this tub for everything and it makes in ideal feeding bucket for horses and ponies! The golf patterned handle..
From £7.95 (inc. VAT) £6.63 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo