100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Coat Care

Gallop® Colour Enhancing Shampoos are uniquely formulated luxury shampoos available for every colour of horse and pony. The shampoos can be used routinely but are ideal for show preparation for that extra edge. These shampoos use colour enhancers and..
From £9.95 (inc. VAT) £8.29 (ex. VAT)
Gallop® Stain Removing Shampoo is an extra thick, concentrated, purple formula with powerful stain removing properties to enable you to remove the most stubborn and ingrained grass and stable stains. Ideal for light coloured horses and problem areas ..
From £9.95 (inc. VAT) £8.29 (ex. VAT)
Canter® Coat Shine helps repel grass stains, mud and soiling and provides an oil free shine, leaving the coat non-greasy. This multi-use coat conditioner not only makes the application of quarter markings easy but can also be applied to the chest and..
From £12.50 (inc. VAT) £10.42 (ex. VAT)
With immediate results, Canter’s Stain Master is ideal for removing dirt and manure stains with no need to rinse. Fantastic for last minute show touch ups as an ‘on the spot’ brightener for white markings. Stain Master can also be used as a dry shamp..
From £12.50 (inc. VAT) £10.42 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo