100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Clippers and Trimmers

The Black Beauty is Liveryman’s most powerful clipper. Developed and tested in the UK, the Black Beauty has been designed to cut through the heaviest of winter coats with ease and can run for extended periods without over-heating, making this the ide..
From £377.50 (inc. VAT) £314.58 (ex. VAT)
Quality lightweight clipper with high torque permanent magnet motor with 2-way speed switch. It is easy to use regardless of user ability and ideal for use as a light duty clipper.  Features: Medium duty Variable speed to suit temperament ..
From £219.95 (inc. VAT) £183.29 (ex. VAT)
The Classic cordless trimmer from Liveryman provides a professional finish every time. Features: Precise and powerful Ideal for trimming faces, legs, feathers, tidying hogged manes, blending and precision clipping Can also be used for pe..
From £139.95 (inc. VAT) £116.63 (ex. VAT)
The perfect addition to any grooming kit, the Liveryman Nova has been designed with agility in mind. The Nova’s shape and weight make it easy to manoeuvre. Perfect for show preparation, tidying-up or maintaining clip lines. Features: Fully a..
From £59.95 (inc. VAT) £49.96 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo