100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Socks

These Tredstep socks are designed to meet the demands of the competition rider. Made in Italy using the latest in advanced performance yarns combining unparalleled function with stylish detailing. Anti friction Tencil yarns provide additional comfor..
From £12.95 (inc. VAT) £10.79 (ex. VAT)
AriatTEK Slimline Performance socks are designed to keep your feet comfy and dry. Features: Moisture Movement Technology™ wicks moisture away from the skin Performance anti-microbial fabrication Arch support with breathable mesh wrap A..
From £11.99 (inc. VAT) £9.99 (ex. VAT)
Made with Bamboo Fibre, the Woof Wear Long Riding Sock is naturally anti-bacterial and anti-fungal. The thermostatic effect ensures the socks are warm in winter and cool in summer and the padded heel and toe with elasticated arch support give a comfo..
From £13.99 (inc. VAT) £11.66 (ex. VAT)
The wool blend of Woof's Winter socks makes them naturally thermal with a padded foot for extra comfort. Designed to be worn under riding boots, these socks benefit from an elasticated ankle and instep for an engineered precision fit. Feature..
From £18.99 (inc. VAT) £15.83 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo