100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Side Reins

Leather side reins with elastic inserts and trigger clips.Size: 32" x 5/8"..
From £19.99 (inc. VAT) £16.66 (ex. VAT)
Web side reins with elastic inserts and trigger clips. Sold in pairs. Measures 1"(25mm) wide. One size. ..
From £9.99 (inc. VAT) £8.33 (ex. VAT)
Adjustable Oak Bark leather side reins hand made on site. Features: 1” Oak Bark leather Stainless steel fixtures Comes complete with adaptors for breaking rollers and girths Very strong Can be made with elastic inserts. Note: Th..
From £65.95 (inc. VAT) £54.96 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo