100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Race

The Stride Free forward cut Race saddle is designed to free up a horse's shoulders to allow for a more fluid stride. The use of goat leather makes the saddle lighter and integrated weight pockets means there is no need for an additional weight cloth...
From £385.00 (inc. VAT) £320.83 (ex. VAT)
The ultra-light race saddle from Zilco is built on a newly designed, formed plastic tree with a steel reinforced gullet. Features: Ultra-light weight – 185g approx. 600 denier cordua fabric for durability Patent finish binding and matchi..
From £279.99 (inc. VAT) £233.33 (ex. VAT)
Zilco's super shiny race saddles are easy to maintain, high quality and hard wearing. Features: Ultra-modern look Easy to clean and hard wearing material 2 year guarantee on the tree Seat length 31cm Synthetic billet strap 16mm (5/8"..
From £269.99 (inc. VAT) £224.99 (ex. VAT)
Zilco's super shiny race saddles are easy to maintain, high quality and hard wearing. Features: Ultra-modern look Easy to clean and hard wearing material 2 year guarantee on the tree Seat length 36cm Synthetic billet strap 19mm (3/4"..
From £294.99 (inc. VAT) £245.83 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo