100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Pads

Superb impact absorption. Protects areas where damage could be caused by ill-fitting saddles. Allows airflow to help the regeneration of new tissue to already affected areas.One size...
From £48.50 (inc. VAT) £40.42 (ex. VAT)
The shaped gel saddle pad has an evolutionary high tech design to aid spinal pressure relief and assist in grip and comfort.One size...
From £45.45 (inc. VAT) £37.88 (ex. VAT)
4mm or 6mm thick sharkskin for use underneath the saddle to help prevent slippage. Can be cut to a desired size and shape at home. ..
From £29.50 (inc. VAT) £24.58 (ex. VAT)
These quality quilted saddle cloths are made and bound in the colour of your choice. They can be personalised on both sides with emboirdery of up to 12 letters in a corresponding colour to your binding choice. Perfect as a gift or for identifying tac..
From £46.90 (inc. VAT) £39.08 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo