100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Saddles and Bridles

This synthetic bridle from Zilco is suitable for race, exercise and general riding. Features: Waffle padded head, brow and nose 6mm cheeks Stainless steel buckles May be used with or without the cavesson. Pony Size. Will fit 13.2h..
From £55.99 (inc. VAT) £46.66 (ex. VAT)
These rubber grip reins are ideal for Pony Racing with Stainless Steel buckle fastenings to give added security (which are also a requirement for racing) and rubber grips that are set back 12"/30cm from the bit to ensure a perfect hold when Pony Raci..
From £39.95 (inc. VAT) £33.29 (ex. VAT)
This quality leather bridle head is ideal for Pony Racing with its plain headstall and browband. The cheek pieces come with buckle ends (not hook studs as shown) which is essential for racing. All fittings stainless steel for longevity. Headstall ..
From £32.95 (inc. VAT) £27.46 (ex. VAT)
This flash noseband is beautifully raised and softly padded. The addition of a 1/2"(13mm) flash strap on this noseband helps prevent bit evasion. The noseband strap buckle features a leather anti-pinching tab behind the buckle. This flash noseband ca..
From £26.95 (inc. VAT) £22.46 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo