100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Pads

4mm or 6mm thick sharkskin for use underneath the saddle to help prevent slippage. Can be cut to a desired size and shape at home. ..
From £29.50 (inc. VAT) £24.58 (ex. VAT)
These quality quilted saddle cloths are made and bound in the colour of your choice. They can be personalised on both sides with emboirdery of up to 12 letters in a corresponding colour to your binding choice. Perfect as a gift or for identifying tac..
From £46.90 (inc. VAT) £39.08 (ex. VAT)
An anti-slip pad from Zilco designed to be placed directly against the horses back to prevent saddle slippage. Made from 5mm thick shock absorbing and breathable neoprene with 2mm holes, spaced 5mm apart and bound with a soft polyester binding. Sm..
From £18.50 (inc. VAT) £15.42 (ex. VAT)
Made with a bonded and padded mesh top with porous polyester fibre filling that is breathable. The rubber mesh lining not only allows for greater airflow but also grips, keeping both the saddle and saddle cloth in place. Reflective padded binding ..
From £108.99 (inc. VAT) £90.83 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo