100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Exercise

***New design for 2021 - raised seat and extra padding for added comfort for the rider, same outstanding comfort for the horse!*** The Stride Free exercise saddle is designed to free up a horse's shoulders to allow for a more fluid stride. Feat..
From £625.00 (inc. VAT) £520.83 (ex. VAT)
The Paul Jones full tree exercise saddle is made in England using top quality English leather and is available in either black or brown. Features: Memory foam seat Buffallo girth straps Safety stirrup bars Top quality English leather ..
From £540.00 (inc. VAT) £450.00 (ex. VAT)
The Flemington is a new saddle from Peter Horobin, maker of the revolutionary Stride Free racing saddles, adding a more affordable saddle to his range. Features: Flexi-tree High quality Indian leather Comfortable Affordable yet durable..
From £350.00 (inc. VAT) £291.67 (ex. VAT)
The Paul Jones half tree exercise saddle is made in England using top quality English leather and is available in either black or brown. Features: Buffallo girth straps Safety stirrup bars Top quality English leather Contrast stitching..
From £445.00 (inc. VAT) £370.83 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo