100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Reins

These rubber grip reins are ideal for Pony Racing with Stainless Steel buckle fastenings to give added security (which are also a requirement for racing) and rubber grips that are set back 12"/30cm from the bit to ensure a perfect hold when Pony Raci..
From £39.95 (inc. VAT) £33.29 (ex. VAT)
Pony reins made from top quality English leather. Hook billet ends. Width: 1/2” Length: 48” ..
From £34.99 (inc. VAT) £29.16 (ex. VAT)
Our 5* rubber grip reins are made using orange Equus rubber grips and the highest quality English hide, finished with stainless steel buckle billet ends. 3/4" wide, small pimple grips - a popular choice in horse racing for race day. ..
From £65.00 (inc. VAT) £54.17 (ex. VAT)
The EJ Wicks 4* reins are a more economical alternative to the 5* range, made with high quality German leather, orange Kris rubber grips and stainless steel buckles. 3/4" wide, small pimpled grips - a popular choice for race day. ..
From £38.50 (inc. VAT) £32.08 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo