100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Martingales

Synthetic girth loop from Zilco designed to loop over the girth and allow you to attach training aids, martingales and other clip ended attachments to the girth as required. One size. ..
From £6.75 (inc. VAT) £5.63 (ex. VAT)
Used to provide the rider with something to hold on to when extra stability or balance is required. Useful on young or unpredictable horses and also when racing.The EJ Wicks Exercise neck strap is made from our high quality 5/8" English leather. It a..
From £18.95 (inc. VAT) £15.79 (ex. VAT)
Used to provide the rider with something to hold on to when extra stability or balance is required. Useful on young or unpredictable horses and also when racing.The EJ Wicks Race neck strap is made from our high quality 1/2" English leather...
From £16.95 (inc. VAT) £14.13 (ex. VAT)
Used to provide the rider with something to hold on to when extra stability or balance is required. Useful on young or unpredictable horses and also when racing. The Zilco Neck Strap is made from coated webbing and is 13mm (1/2") wide. One size..
From £10.99 (inc. VAT) £9.16 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo