100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Bridle Parts

Hand stitched in England, these browbands are made with the finest English leather. Havana only. ..
From £9.95 (inc. VAT) £8.29 (ex. VAT)
Hand stitched browband made with the finest European leather. Havana only. ..
From £6.95 (inc. VAT) £5.79 (ex. VAT)
Hand stitched in England, these bridle cheeks are made with the finest English leather. Havana only. ..
From £25.50 (inc. VAT) £21.25 (ex. VAT)
Hand stitched bridle cheeks made with the finest European leather. Havana only. ..
From £13.95 (inc. VAT) £11.63 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo