100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Breastgirths

Lightweight web and elastic breastgirth from O Shepherds. 2” web, foam backed for comfort. ..
From £41.95 (inc. VAT) £34.96 (ex. VAT)
Featherweight breastgirth from O Shepherds. Very lightweight 2” web backed with non-slip foam, elastic ends and synthetic straps. ..
From £41.95 (inc. VAT) £34.96 (ex. VAT)
Lightweight breastgirth from O Shepherds made using 1” web, foam backed for comfort, and elastic inserts. Lighter than the all-elastic breastgirth with a little less give. Ideal for flat racing. ..
From £41.95 (inc. VAT) £34.96 (ex. VAT)
Zilco's ultra light breastgirth has a total weight of 160g. Made from lightweight polypropylene with elastic in grey, black and white with grey straps. Matching girth and surcingle available. ..
From £30.99 (inc. VAT) £25.83 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo