100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Chifney

Used to help gain instant control of a horse which is acting up. Features: Leather covered chain Elastic on both cheeks to ensure equal pressure Trigger clip for ease of removal Removable double buckle coupling at the back for leading ..
From £75.00 (inc. VAT) £62.50 (ex. VAT)
Designed for leading not riding. Useful when leading difficult or strong horses or those that are likely to rear. Hand stitched onto an English leather slip head. ..
From £40.95 (inc. VAT) £34.13 (ex. VAT)
Designed for leading not riding. Useful when leading difficult or strong horses or those that are likely to rear. Use in conjunction with a chifney headpiece. Stitched on option available. ..
From £27.00 (inc. VAT) £22.50 (ex. VAT)
Designed for leading not riding. Useful when leading difficult or strong horses or those that are likely to rear. The leather cover makes it a little softer in the horse's mouth than the standard Chifney. Comes with a stitched on leather head. ..
From £56.00 (inc. VAT) £46.67 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo