100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Stirrups

Aluminium stirrups from Zilco with PVC cover for extra grip.Features:Two widths availableWeight: 9cm - 250g per pair, 10cm - 270g per pair...
From £26.75 (inc. VAT) £22.29 (ex. VAT)
Extremely light stirrups from Zilco weighing just 95g per pair. Features: Made from extremely strong DuPont plastic 9cm wide Approx 15% stronger than similar style aluminium stirrups. ..
From £23.95 (inc. VAT) £19.96 (ex. VAT)
The ultimate high-performace, ergonomic racing stirrup from Compositi. Features: Extra-strong moulded polymer Wider soleplate provides greater comfort for all riding styles Anti-slip sole Impact and moisture resistant Unaffected by l..
From Now £91.20 (inc. VAT) Was £159.95 (inc. VAT) £76.00 (ex. VAT)
RACING Tech Stirrups for those who demand speed Produced entirely in Italy and designed with input from professional jockeys, these stirrups are made of a special alluminium alloy billet to make them extremely lightweight yet strong. Fitted with s..
From £139.95 (inc. VAT) £116.63 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo