100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Stirrup Leathers

Super soft English leather is wrapped around a web lining to create a supple yet strong stirrup leather of the highest quality. Features: Non-stretch web lined for strength Top quality English leather Stainless steel roller buckle Slim..
From £61.99 (inc. VAT) £51.66 (ex. VAT)
The EJ Wicks 5* stirrup leathers are made from the highest quality English hide, finished with stainless steel buckles. One size only 48”. ..
From £57.90 (inc. VAT) £48.25 (ex. VAT)
The EJ Wicks 4* stirrup leathers are made from the high quality European hide, finished with stainless steel buckles. One size 48” ..
From £38.50 (inc. VAT) £32.08 (ex. VAT)
Handmade from top quality Buffalo hide which is renowned for it's durability, making them a much harder wearing alternative to standard leather stirrup leathers. 1" width. Note: The nature of Buffalo hide means there will be some stretch to the le..
From £73.95 (inc. VAT) £61.63 (ex. VAT)

Customer Reviews

There are no reviews for this product.

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo