100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Race Girths and Surcingles

Featherweight or ultra light racing girth made from woven polyester backed with non-slip foam. Elastic at one end with roller buckles and synthetic straps. ..
From £35.99 (inc. VAT) £29.99 (ex. VAT)
The featherweight (or super light) O Shepherds racing surcingle has elastic at one end with roller buckles and synthetic straps. Colour co-ordinated to match the O Shepherds featherweight racing girths. XS (Pony): 59” – 72” (150cm – 183cm) Smal..
From £35.99 (inc. VAT) £29.99 (ex. VAT)
This double buckle girth from Shepherds is a popular choice for Point-to-Pointers. Features: 3" web with a non-slip lining Keepers for the over girth Dual elastic inserts at one end. ..
From £40.50 (inc. VAT) £33.75 (ex. VAT)
Lightweight racing girth made from woven polyester backed with non-slip foam. Elastic at one end with roller buckles and synthetic straps. ..
From £35.99 (inc. VAT) £29.99 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo