100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Girths

Synthetic girth loop from Zilco designed to loop over the girth and allow you to attach training aids, martingales and other clip ended attachments to the girth as required. One size. ..
From £6.75 (inc. VAT) £5.63 (ex. VAT)
Designed for the comfort of your horse this web girth offers a choice of two detachable linings. Heavy duty elastic inserts at both ends even out pressure, with roller buckles and centre D-ring. Linings securely attach with a touch and close layer al..
From £35.95 (inc. VAT) £29.96 (ex. VAT)
The Stubben string girth is made from 14 strands of super soft nylon cord and stainless steel roller buckles to prevent rust. The broad design means that the load is spread over a wide area and these are a popular choice for those looking to improve ..
From £48.50 (inc. VAT) £40.42 (ex. VAT)
The new Thorowgood Cob Girth features split ends at BOTH ends to reach splayed Point and Balance strap girthing arrangements, making this girth a particularly good choice for Cobs or other big barrelled conformations. Non-elasticated to hold the s..
From £28.95 (inc. VAT) £24.13 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo