100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Girth Sleeves and Rubbers

Towelling girth sleeve designed for slipping over the girth to protect the horse from rubbing and galling. Also helps to keep girths clean and useful if using a girth on multiple horses as it is easily washed. Made in England. ..
From £4.95 (inc. VAT) £4.13 (ex. VAT)
Cotton girth sleeve designed to protect the girth from dirt and grime. Particularly useful if using the same girth on multiple horses as sleeves can be easily changed and washed to protect from the spread of infection. Made in England. ..
From £4.80 (inc. VAT) £4.00 (ex. VAT)
Fleece girth sleeve designed to protect the girth from dirt and grime. Particularly useful if using the same girth on multiple horses as sleeves can be easily changed and washed to protect from the spread of infection. ..
From £4.95 (inc. VAT) £4.13 (ex. VAT)
Hard wearing towelling rubbers with hemmed edges. Widely used in racing under saddles for hygene purposes. Machine washable. ..
From £12.95 (inc. VAT) £10.79 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo