100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Stable Rugs

This superior insulating stable rug for ponies is your winter warrior against the cold weather. The Amigo Insulator Plus 200g stable rug features a detachable neck allowing flexiblity in fluctuating temperatures. Features: 210D Ripstop polye..
From £94.95 (inc. VAT) £79.13 (ex. VAT)
This medium weight rug is ideal for keeping you horse warm in cooler weather. Features: 210D Ripstop polyester outer and fibrefill insulation Antibacterial, anti-static, shine enhancing polyester lining Classic cut design with double fro..
From £79.95 (inc. VAT) £66.63 (ex. VAT)
Keep your horse cosy and warm this winter in this Bridleway stable rug. Features: Quilted with 200g fill Fully lined Breathable 210 denier outer Navy.   ..
From £39.95 (inc. VAT) £33.29 (ex. VAT)
Allow your horse to enjoy improved comfort in the stable with Horseware’s Rhino® Original heavyweight stable rug. Features: Strong and durable 1000D polypropylene Vari-layer technology means rug weight decreases lower down the rug, ensurin..
From £107.95 (inc. VAT) £89.96 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo