100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Accessories

This vest is simple to fit and great for preventing rub injuries under rugs. Made from stretch fabric, the vest goes on over the horse’s head and is secured using an elasticated surcingle which fastens round the girth area, creating a second skin to ..
From £29.99 (inc. VAT) £24.99 (ex. VAT)
50m roll of 3 strand cotton tail string. ..
From £49.95 (inc. VAT) £41.63 (ex. VAT)
Synthetic sheepskin pad for use with paddock rollers...
From £12.00 (inc. VAT) £10.00 (ex. VAT)
This bib can be invaluable for show ponies and horses when presentation is everything. The lightweight satin fabric allows the rug to glide over vulnerable areas, such as the shoulders, chest and withers minimising the risk of hair loss, chafing or s..
From £10.99 (inc. VAT) £9.16 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo