100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Paddock Sheets

Handmade to order in England, the Paddock Sheet is made from a fine knit 100% Melton wool, giving a smarter finish than the exercise sheet.  Features: 100% Melton wool, fine knit Your choice of colour for the wool and the binding Doubl..
From £104.40 (inc. VAT) £87.00 (ex. VAT)
Handmade to order in England, this waterproof paddock sheet can be worn alone or over an additional paddock sheet for protection from wet weather. Features: Fully lined with Melton wool Fillet string loops and tail string included as sta..
From £96.00 (inc. VAT) £80.00 (ex. VAT)
Made from close knit polyester fabric which allows the horse to cool down gradually. Features: Large clip fastening at the front Handmade to order Range of colour and binding options Initials and embroidery can be added – tick box to b..
From £68.40 (inc. VAT) £57.00 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo