100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Fly Sheets

Horseware's Mio Flu Rug is their most affordable in the range, made from knitted polyester. Features: Classic front closures Front leg arches Integrated hood Two cross surcingles Breathable UV protection Supersized tail flap with..
From £47.50 (inc. VAT) £39.58 (ex. VAT)
This effective fly rug from Bridleway is made from cooling mesh fabric making it ideal for warmer weather when flies are about. Features: Two chest straps Adjustable belly flap Large tail flap Fillet strap. ..
From £34.50 (inc. VAT) £28.75 (ex. VAT)
The ultimate summer arsenal of sweet-itch and fly defence are encompassed in this rug from Bridleway’s Metabug range. Features: Blocks biting insects to keep irritations at bay Hardwearing, 600 denier ripstop upper blocks 90% of harmful UV..
From £50.00 (inc. VAT) £41.67 (ex. VAT)
This mesh fly rug does a great job of keeping the horse cool and comfortable whilst providing an effective barrier to flies and bugs. Features: UV reflective fabric helps guard against sun bleach Improved seamless neck design Lining to t..
From £47.99 (inc. VAT) £39.99 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo