100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Goggles

The Triple-Slot™ jockey goggle was designed for optimal fit with wider style European racing helmets. The bands are attached in a forward perpendicular location allowing the goggle to seal properly against the face even when used over wide helmets. S..
From £12.50 (inc. VAT) £10.42 (ex. VAT)
This is the original jockey goggle used for horse racing worldwide since Kroops invented it in the 1940's. Made with a proprietary high clarity, scratch resistant lens, stitched edging and brass hardware. Available with a clear lens or a Grey tinted ..
From £12.50 (inc. VAT) £10.42 (ex. VAT)
SSG's safety sports goggles for Racing, Polo, Driving and other equestrian sports Anti-fog lens Black sponge lens support for comfort and dust elimination Thin, adjustable elastic strap for comfort. ..
From £27.99 (inc. VAT) £23.33 (ex. VAT)
Classic style triple slot racing goggles made in a slightly smaller size for children. Available with clear or tinted lenses. ..
From £9.50 (inc. VAT) £9.50 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo