100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More High Viz

Top off your brightest 'be seen' outfit with an EQUI-FLECTOR® hat cover to stay as visible as possible in poor light conditions or when road riding. Brightly coloured with reflective stars. One size. ..
From £13.99 (inc. VAT) £11.66 (ex. VAT)
This safety vest gives the wearer visibility when riding on the road or in low light. Featuring one inside pocket, reflective strips, zip fastening & a printed back. ..
From £14.50 (inc. VAT) £12.08 (ex. VAT)
Bright fabrics and reflective strips to add visibility when out riding. A rubberised strap and elastic insert helps to keep it securely in place. One size. ..
From £7.99 (inc. VAT) £6.66 (ex. VAT)
This safety vest gives the wearer visibility when riding on the road or in low light. Featuring one inside pocket, reflective strips, zip fastening & a printed back. Note: These sizes preceed the adult size XS. ..
From £12.99 (inc. VAT) £12.99 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo