100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Luggage

Heavy duty gear bag from Zilco made from a strong canvas fabric and webbed handles. 75cm x 36cm x 36cm ..
From £37.75 (inc. VAT) £31.46 (ex. VAT)
Extra extra large heavy duty gear bag from Zilco made from a strong canvas fabric and webbed handles which is able to hold an enormous amount of tack. 90cm x 50cm x 50cm ..
From £42.50 (inc. VAT) £35.42 (ex. VAT)
Made from heavy duty waterproof vinyl, this gear bag is large enough to hold an enormous amount of tack. It has strong webbing handles with comfort grip closure and a D ring which the zip can be paddlocked to. 85cm x 35cm x 45cm ..
From £72.99 (inc. VAT) £60.83 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo