100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Colours Bag

Our canvas Colours Bag is ideal for storing your racing colours in while travelling to the races. Bags can be personalised with embroidered names or initials at no extra cost. Note: There is a 20 character limit – please complete the Personalise b..
From £75.00 (inc. VAT) £62.50 (ex. VAT)
Handmade on site from top quality brown English leather, our traditional colours bag is lined with Tattersall checked cotton and is finished with brass buckles and a folded, hand finished leather handle. Two adjustable straps on the rear can be us..
From £275.00 (inc. VAT) £229.17 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo