100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Jackets

The New Breeze Up 'Monsoon' Unisex Jacket is warm, windproof, breathable and most importantly waterproof! This jacket is ideal for the worst winter days. Combine with the Breeze Up Mosoon trousers for the ultimate protection from the elements. ..
From £89.95 (inc. VAT) £74.96 (ex. VAT)
We love PC Racewear’s latest waterproof jacket!  The new Kagool is part of the Jamb range, which has proved itself to be a match for even the worst of the British weather. Lightweight and weatherproof, this jacket protects against the elements whi..
From £99.95 (inc. VAT) £83.29 (ex. VAT)
PC Racewear’s Stride long coat is perfect for those wet days when you can’t avoid the rain. Features: Stylish, contoured fit Weatherproof Zip and button up for flexibility when switching between riding and walking External hand pockets..
From £127.00 (inc. VAT) £105.83 (ex. VAT)
The Equiento Stormtex jacket is made with a waterproof, windproof and breathable outer layer of Ultra-Black nylon tactel fabric with a nylon lining and a polyester filling for additional warmth. A cleverly thought out design makes it ideal for riding..
From £139.95 (inc. VAT) £116.63 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo