100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Socks

These Tredstep socks are designed to meet the demands of the competition rider. Made in Italy using the latest in advanced performance yarns combining unparalleled function with stylish detailing. Anti friction Tencil yarns provide additional comfor..
From £12.95 (inc. VAT) £10.79 (ex. VAT)
The wool blend of Woof's Winter socks makes them naturally thermal with a padded foot for extra comfort. Designed to be worn under riding boots, these socks benefit from an elasticated ankle and instep for an engineered precision fit. Feature..
From £18.99 (inc. VAT) £15.83 (ex. VAT)
AriatTEK Performance socks are specifically designed to keep your feet dry, supported and protected, keeping you comfy from morning to evening. Features: Moisture Movement Technology™ wicks moisture away from the skin Stay-cool performance..
From £12.00 (inc. VAT) £10.00 (ex. VAT)
Woof Wear’s Young Rider Pro Socks are the ultimate performance socks, keeping aspiring professionals cool in Summer and warm in Winter. Features: Blended Bamboo Fibres - naturally anti-bacterial Waffle knit to accelerate wicking,..
From £9.99 (inc. VAT) £9.99 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo