100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Reins

Pony reins made from top quality English leather. Hook billet ends. Width: 1/2” Length: 48” ..
From £34.99 (inc. VAT) £29.16 (ex. VAT)
These rubber grip reins are ideal for Pony Racing with Stainless Steel buckle fastenings to give added security (which are also a requirement for racing) and rubber grips that are set back 12"/30cm from the bit to ensure a perfect hold when Pony Raci..
From £39.95 (inc. VAT) £33.29 (ex. VAT)
Our 5* rubber grip reins are made using orange Equus rubber grips and the highest quality English hide, finished with stainless steel buckle billet ends. 3/4" wide, small pimple grips - a popular choice in horse racing for race day. ..
From £65.00 (inc. VAT) £54.17 (ex. VAT)
The EJ Wicks 4* reins are a more economical alternative to the 5* range, made with high quality German leather, orange Kris rubber grips and stainless steel buckles. 3/4" wide, small pimpled grips - a popular choice for race day. ..
From £38.50 (inc. VAT) £32.08 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo