100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Racing Bridles

The EJ Wicks 4* exercise bridle is made from the high quality European hide, finished with stainless steel buckle billeted ends. Made to EJ Wicks specifications for exercise usage and the choice of many top race yards. Comes with orange 7/8" Kris rub..
From £95.90 (inc. VAT) £79.92 (ex. VAT)
This quality leather bridle head is ideal for Pony Racing with its plain headstall and browband. The cheek pieces come with buckle ends (not hook studs as shown) which is essential for racing. All fittings stainless steel for longevity. Headstall ..
From £32.95 (inc. VAT) £27.46 (ex. VAT)
The EJ Wicks 4* race bridle is made from the highest quality European hide, finished with stainless steel buckle billet ends. Made to EJ Wicks specifications for use on race day and the choice of many top yards. Comes with 3/4" Kris rubber grip reins..
From £95.90 (inc. VAT) £79.92 (ex. VAT)
Our stitched on Triabit bridles are a popular choice with many race yards. Made from our 5* high quality English leather, the bridles come with plain a browband and stitched detail cavesson noseband. The Triabit and reins, which use Equus small pimpl..
From £214.45 (inc. VAT) £178.71 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo