100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Racing Boots

Super smart National Hunt leather race boots from Sergio Grasso with a red patent hunting top. Features: Elastic gusset Reinforced heel and toe Padded ankle Rear zip Ultra light sole.   ..
From £190.00 (inc. VAT) £158.33 (ex. VAT)
Super smart Flat leather race boots from Sergio Grasso with a black patent hunting top. Features: Elastic gusset Reinforced heel and toe Padded ankle Rear zip Ultra light sole.   ..
From £180.00 (inc. VAT) £150.00 (ex. VAT)
Tuffa’s Aintree racing boots, also referred to as their National Hunt racing boots. Features: Fine, yet robust soft leather upper Black with mahogany top Heel height 6mm Average weight: 900 grams. ..
From £163.99 (inc. VAT) £136.66 (ex. VAT)
Designed for racing, the Molton racing boots are slim-fitting and lightweight. Features: Synthetic Patent upper Texon insole and ½ leather inner-sock Heel height 12mm Weight 0.48 kg ..
From £124.95 (inc. VAT) £104.13 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo