100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Racewear

Close fit stretch baselayer for children. Ideal for Pony Racing and for wearing under body protectors. Size guide: XXXS (9-10 yrs) XXS (11-12yrs) ..
From £25.50 (inc. VAT) £25.50 (ex. VAT)
Long sleeve, close fit stretch baselayer for children. Ideal for Pony Racing and for wearing under body protectors. Size guide: XXXS (9-10 yrs) XXS (11-12yrs) ..
From £29.95 (inc. VAT) £29.95 (ex. VAT)
Close fit stretch baselayer designed with comfort in mind – ideal for pony racing and all young riders. Features: Close fit Stretch fabric Breathable Sleeveless design. Size Guide: XXXS (9-10yrs) XXS (11-12yrs) ..
From £24.00 (inc. VAT) £24.00 (ex. VAT)
Designed for racing, the Molton racing boots are slim-fitting and lightweight making them ideal for younger jockeys. Features: Synthetic Patent upper Texon insole and ½ leather inner-sock Heel height 12mm Weight 0.48 kg ..
From £109.95 (inc. VAT) £109.95 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo