100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Accessories

Featherweight breastgirth from O Shepherds. Very lightweight 2” web backed with non-slip foam, elastic ends and synthetic straps. ..
From £44.65 (inc. VAT) £37.21 (ex. VAT)
Lightweight web and elastic breastgirth from O Shepherds. 2” web, foam backed for comfort. ..
From £44.65 (inc. VAT) £37.21 (ex. VAT)
A narrow version of O Shepherds all elastic breastgirth with black synthetic straps, designed for use in horse racing and exercising. Made with 1" strong, durable, lightweight elastic. ..
From £35.95 (inc. VAT) £29.96 (ex. VAT)
O Shepherds all elastic breastplate with black synthetic straps designed for use in horse racing. One size – Pony. (Larger size available in the general Breastplate section.) ..
From £41.95 (inc. VAT) £34.96 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo