100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Pads

Shepherds non-slip mesh is used under race saddles to stop them slipping. Ultra lightweight. ..
From £8.50 (inc. VAT) £7.08 (ex. VAT)
Shepherds bound race day pads are widely used in racing as a non-slip saddle pad. Features: Reinforced wither with synthetic sheepskin to prevent rubbing Anti-rubbing strip along the bottom on both sides Range of binding colours 20" x ..
From £21.60 (inc. VAT) £18.00 (ex. VAT)
Shepherds bound race day pads are widely used in racing as a non-slip saddle pad. Features: Reinforced wither with synthetic sheepskin to prevent rubbing Anti-rubbing strip along the bottom on both sides Range of binding colours 21" x ..
From £24.95 (inc. VAT) £20.79 (ex. VAT)
Superb impact absorption. Protects areas where damage could be caused by ill-fitting saddles. Allows airflow to help the regeneration of new tissue to already affected areas.One size...
From £48.50 (inc. VAT) £40.42 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo