100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Numnahs

Stand out with the ARMA cotton finish numnah, smart enough for competing or for everyday use. Features: Breathable stay-smart anti-pill 100% cotton outer Ultra Dri Zone lining instantly wicks sweat from the horse Secured with touch close..
From £31.99 (inc. VAT) £26.66 (ex. VAT)
Treat your horse to this luxury ARMA SupaFleece numnah. Half lined and edged with synthetic sheepskin fur to protect against shock, sores and chafing. Features: Deep ProComfort SupaFleece increases airflow Relieves pressure Controls mois..
From £43.95 (inc. VAT) £36.63 (ex. VAT)
This cotton finish, fleece lined half pad from ARMA adds an extra layer of protection for your horse Features: Quilted on the outside Deep Pro Comfort Supafleece lined Contoured shape for good wither clearance Numnah or saddlecloth gir..
From £36.99 (inc. VAT) £30.83 (ex. VAT)
Accommodate a horse's changing shape to maintain good saddle fit with the ARMA Corrective half pad. Featuring four pockets, varying degrees of adjustment can be accommodated using the low compression shim inserts which are supplied as three sets. ..
From £44.95 (inc. VAT) £37.46 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo