100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Nosebands

Traditional rubber noseband, also known as an Australian Cheeker, which helps to position the bit correctly and assists in preventing a horse from getting his tongue over the bit. Comes complete with leather tab to fasten to head piece. Often used in..
From £9.96 (inc. VAT) £8.30 (ex. VAT)
English leather Grackle noseband with British sheepskin pad. Helps to prevent a horse from crossing his jaw. ..
From £39.99 (inc. VAT) £33.33 (ex. VAT)
The grackle noseband has been designed to help prevent the horse from crossing their jaw and opening their mouth and features soft padding for maximum comfort. Noseband fastens either side of the bridle providing a symmetrical fit. Features: ..
From £75.00 (inc. VAT) £62.50 (ex. VAT)
The Mexican Grackle has a similar purpose to a standard Grackle noseband by preventing the horse from crossing its jaw. However the higher fit above the cheekbones allows greater expansion of the horse's nostrils which makes this ideal for high tempo..
From £54.95 (inc. VAT) £45.79 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo