100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Mane and Tail

Large aluminium mane comb. 105mm long ..
From £1.60 (inc. VAT) £1.33 (ex. VAT)
Small aluminium comb. 105mm long. ..
From £1.10 (inc. VAT) £0.92 (ex. VAT)
A unique double headed grooming rake which can be used on manes and tails as well as winter coats. Features: Easily removes hair as you comb the mane or tail Ideal for shaping, finishing, thinning and creating a hand stripped look Remove..
From £23.40 (inc. VAT) £19.50 (ex. VAT)
411m of plaiting thread on a reel, with needle, for creating professional looking plaits. ..
From £13.99 (inc. VAT) £11.66 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo