100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Lycra Pull Ups

Seamless elasticated pull-ups made of soft 4-way stretch, durable fabric. Silicone grips on the inside prevent slippage and the compression tube gives a perfect tight fit. ..
From £19.99 (inc. VAT) £16.66 (ex. VAT)
Ornella Prosperi lycra leg sleeves are used in racing under riding boots although can be used in any equestrian discipline. Features: Shiny lycra finish Can be used under any riding boot One size only. ..
From £19.99 (inc. VAT) £16.66 (ex. VAT)
Ornella Prosperi tubular leg sleeves are used in racing under riding boots although can be used in any equestrian discipline. Features: Made from 75% nylon with elastic and spandex Comfortable fit with elasticated, non slip hem a..
From £19.99 (inc. VAT) £16.66 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo