100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Lunging

1" continental web lunge line, thinner than our standard white lunge lines to allow the line to travel more smoothly through D rings.   Features: Buffalo leather buckle end for connecting to the lunge cavesson Heavy duty swivel to preve..
From £72.00 (inc. VAT) £60.00 (ex. VAT)
Soft tubular nylon web lunge rein featuring swivel trigger clip at one end and hand loop at the other. 8 meters in length. ..
From £9.99 (inc. VAT) £8.33 (ex. VAT)
1.25" white tubular web lunge line. This line has a buffalo leather buckle end for connecting to the lunge cavesson with a heavy duty swivel to prevent the line from tangling. A buffalo leather chape reinforces the join between swivel and line. There..
From £46.50 (inc. VAT) £38.75 (ex. VAT)
Polypropylene webbing training roller with fleece lining for added comfort. Features: 10 nickel plated D rings for endless options Double buckle girth with D Fleece lining. Small  (142cm-188cm, 56” – 74”). Large (152cm-203cm, 6..
From £36.50 (inc. VAT) £30.42 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo