100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Luggage

Keep your personal belongings safe whilst also making sure you are seen this winter with Bridleway’s high viz bum bag. Features: Lightweight and practical Two secure outer zip pockets Adjustable waist strap Reflective prints on a brigh..
From £14.99 (inc. VAT) £12.49 (ex. VAT)
Heavy duty gear bag from Zilco made from a strong canvas fabric and webbed handles. 75cm x 36cm x 36cm ..
From £37.75 (inc. VAT) £31.46 (ex. VAT)
Extra extra large heavy duty gear bag from Zilco made from a strong canvas fabric and webbed handles which is able to hold an enormous amount of tack. 90cm x 50cm x 50cm ..
From £42.50 (inc. VAT) £35.42 (ex. VAT)
Made from heavy duty waterproof vinyl, this gear bag is large enough to hold an enormous amount of tack. It has strong webbing handles with comfort grip closure and a D ring which the zip can be paddlocked to. 85cm x 35cm x 45cm ..
From £72.99 (inc. VAT) £60.83 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo