100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Leads

Synthetic leather coupling from Shepherds with buckled ends for attaching to the bit. Used to lead horses up when bridled. ..
From £19.95 (inc. VAT) £16.63 (ex. VAT)
Leather lead rein from the Shires Velociti range with buckle billet and hand loop. Measures 72"(1.80m) long, 3/4” wide. ..
From £20.99 (inc. VAT) £17.49 (ex. VAT)
Velociti GARA leather couplings attach to both bit rings for extra handling control in the show ring or on race day. Total length: 34cm. ..
From £11.99 (inc. VAT) £9.99 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo